Solution
Hospital operations
A patient safety, compliance and utility intelligence layer that sits above your BMS. Operating theatres, NICU, PICU, isolation and dialysis, monitored continuously and evidenced automatically.
Industries
The physics of a utility does not change between a hospital and a distillery. What changes is which failure matters most, and who is asking you to prove it. Each page below starts from that.

Solutions
Short answer
Aqueduct is a retrofit intelligence layer that sits above any existing BMS, meter or asset and measures water, energy, thermal and air across a site you already operate. It is deployed in hospitals, commercial real estate, manufacturing, stadiums, shopping centres, dairy and distilling, and offered as a partnership to facility services providers, contractors and design practices.
Solution
A patient safety, compliance and utility intelligence layer that sits above your BMS. Operating theatres, NICU, PICU, isolation and dialysis, monitored continuously and evidenced automatically.
Solution
A building energy management layer that sits above any existing BMS, meters water, energy and air per floor and per tenant, and turns operational data into the rating, the recharge and the disclosure your asset is judged on.
Solution
Aqueduct meters water, electricity, steam, compressed air, cooling and effluent across every unit on a campus, reconciles them into balances that have to add up, and turns the largest unmanaged variable in the plant into a managed one.
Solution
Aqueduct meters water, electricity, cooling, air quality and reuse across a working stadium, so the greenest venue becomes the provable one. Compliant, cheaper to run, and ready for the audit before it is asked for.
Solution
Common area cooling, washroom water, food court ventilation and car park extract are the real cost base of a shopping centre. Aqueduct meters all of it, per zone and per tenancy, so recovery is accurate and the plant follows footfall.
Solution
Aqueduct meters process water, CIP, refrigeration, boiler and steam, compressed air and effluent across a working dairy, line by line and shift by shift, without interrupting production. Live data in 2 to 6 weeks.
Solution
The parlour, the plate cooler, the bulk tank and the hot water system are where a dairy farm spends its energy and water. Aqueduct meters them, across one farm or a whole collection network, and catches a failing cooler before the milk is rejected.
Solution
Mashing, distillation, condensing and cleaning make a distillery one of the most water and steam intensive processes in food and drink. Aqueduct meters every flow, closes the balance, and turns spent wash from a liability into a measured stream.
Partnership
Three relationships where Aqueduct sits behind your service rather than in front of your client. Four commercial tracks: referral, resell, embed and white label.
Partnership
Facility management is being asked to evidence energy, water and air performance, not just deliver the service. Aqueduct gives an FM provider the measurement layer to answer that, under your own brand or alongside it.
Partnership
Two things at once: monitoring for your own site utilities during construction, and a specified measurement layer that turns a completed building into a performance asset on day one rather than a promise.
Partnership
Design practices are judged on outcomes they never get to see. A measurement layer specified into your projects closes that loop, feeds your next design, and gives your practice a performance record instead of a portfolio of intentions.
Compliance
Every framework in every market Milvian operates in is moving from modelled to measured, and from voluntary disclosure to mandatory improvement.
| Market | Primary instrument | What it measures | The operational consequence |
|---|---|---|---|
| United States | ASHRAE 90.1, ENERGY STAR benchmarking, city building performance standards | Design compliance, then annual measured benchmarking | Disclosure is becoming performance improvement with penalties attached |
| Canada | NECB 2020, NRCan national benchmarking | Design compliance for buildings 600 m2 or 4 storeys and above, plus measured benchmarking | Benchmarking against a national dataset needs complete, attributable meter data |
| United Kingdom | MEES, ESOS, SECR | Asset EPC rating, organisational energy assessment, disclosed consumption and actions | EPC B for commercial above 1,000 m2 from 2031, and ESOS progress reporting to 2027 |
| Middle East | Al Sa'fat, Estidama Pearl, DSM strategy | Green building compliance at permit, increasingly questioned in operation | Al Sa'fat Silver mandatory for new Dubai permits from 2026, 30 percent demand cut by 2030 |
| India | ECBC, BRSR Core, CCTS | Code compliance above 100 kW connected load, then assured intensity metrics | Assurance providers trace each number to source, so estimates no longer survive |
| Australia | NABERS, Commercial Building Disclosure, NCC Section J | Measured operational performance, publicly disclosed | The rating comes from your meter data and is visible to the market |
Summarised for orientation, not as legal advice. Requirements vary by state, emirate, province and municipality, and by building type and size. Confirm the operative requirement for your own assets.
Next step
A 30 day baseline on a single building, plant or venue. Non invasive, layered on what you already run, and the numbers are yours either way.